Hut 8’s Alberta Bitcoin Mine Running at 15% Installed Hashrate Due to Electrical Issues

“High energy input levels” into the machines has been causing “equipment failures” at Drumheller, while spikes in energy prices have created “additional headwinds,” the firm said. Hut 8 has implemented firmware to decrease the voltage of the power supply, while it is trying to repair machines and hire more staff.